top of page

Company Profile in short

Buildings:

Production Units ( 3 )

- Production unit 1: 50 * 30 Meter ( see picture )

- Production Unit 2: 60 * 12 Meter ( see picture )

- Production Unit 3: 30 * 30 Meter

- Smaple Room Unit: 10 * 8 Meter

Office Units ( 3 )

- unit 1: Director + Accounting + MD + Show room:  14 * 9  Meter

- Unit 2: QC + Paper Pattern +  Follow Up Customer: 7 * 15 Meter

- Unit 3: HRD + Production + PPIC 6 * 11 Meter

 

​Warehouse Units ( 7 )

- Fleece Warehouse: 20 * 10 Meter

- Accesoires Warehouse: 30 * 8 Meter with 2 stores ( see picture )

- Fabric Warehouse 1: 15 * 10 Meter 5 rack high

- Fabric Warehouse 2:   6  * 8  Meter 5 rack high

- Mecanic Warehouse: 15 * 6 Meter

- Carton Warehouse: 40 * 5 Meter

- Padding Warehouse: 30 * 10 Meter

Packing Unit / Finished good Units ( 3 )

- Final Check Unit: 6 * 6 Meter

- Packing Unit: 30 * 10 Meter

- Ready Packed Warehouse: 10 * 15 Meter

Cutting Room Units ( 2 )

fabric: 30 * 30 Meter

padding: 22 * 6 Meter

Distribution Units (2 )

Distribution Units & Quality Check:

- Accesoires:  10 * 3 Meter

- Cut Fabric & Numbering & Artwork: 10 * 10 Meter

Department / Machines / Staff

HRD Dept:

HRD Manager

Staff: 2

Design Dept:

System: Corel draw

Staff: 2 Designers

Paper Pattern Dept:​

System: Lectra

Plotter:

Staff:

- 3 paper pattern

- 2 Grading

- 2 Marker

Merchandising Dept:

Staff

- 4 MD

- 2 Artwork MD

Sample Room Dept:

Staff:

- 2 Follow UP

- 1 Final ChecK

- 22 Sample room staff

Cutting Room Dept:

3 Long Cutting tables

1 fusion machines

1 fabric quality machine

Staff:

- 35 cutting staff

- 10 numbering staff

IT / Embroidery Dept:

IT Manager

12 head full: Tajimah

Staf:

- 9 staff

 

Quality Controll Dept:

QC Manager

3 QC Assistant Manager

Staff:

- 1 QC Pattern

- 1 QC Fabric

- 2 QC Accesoires

- 1 QC Cutti

- 3 QC Artwork

- 20 QC inline

- 6 QC final check ( see picture)

Mecanic Dept:

Staff:

6 mecanic

Warehouse Dept:

Warehouse staff:

- 14 staff

Distribution staff:

- 4 staff

Production Dept:

Production manager

Production Assistan

A) 10 Long outerwear lines:

Staff:

- 6 SV

- 720 Operators

- 25 Assist

- 6 Strika

Machines:

- 350 Yuki/Brother Single needle

- 65 Typical Single needle placket / zipper

- 42 Brother /Yuki Dubble needle

- 25 Snap

- 4 Kansai

- 2 Buttonhole

- 6 Velcro Brother

B) 4 Short fleece / tracksuits / bodywarmer lines:

Staff:

- 1 SV

- 120 Operators

- 10 Assist

Machines:

- 85 Yuki/Brother single needle

- 12 Overdeck

- 3 Barrtag

- 2 Kansia

PPIC Dept:

Spin in the web:

Staff:

- 1 PPIC Manager

- 1 Time Study

- 1 Controll

Packing Dept:

Master polybag or single polybag

Hangtag / Pricticket

Staff:

-17 packing product ( see picture)

- 6 packing cartons ( see picture )

 

bottom of page